Adwa 00 -Ewket
Final Phase
Architecting the
Future Skyline.
Today, we are excited to share a major milestone from our historic Piassa project — Adwa Ewket, our premium G+5 commercial development in the heart of Addis Ababa.
The project has now entered its final finishing phase, following the successful completion of the main structural framework. This marks a significant transition from structural works to high-precision interior finishing, as we move closer to delivering a landmark commercial destination.
Here is the latest on-site progress:
- HCB Block Work: 4th Floor is at 60% completion.
- Prime Coat Application: 2nd Floor has reached 95%, while the 3rd Floor stands at 70%.
- Gypsum Work: Progress is at 90% from Ground to 2nd Floor, and 60% on the 3rd Floor.
- Brick Work (Masonry): 4th Floor work has officially commenced and is currently at 20% completion.
With the heavy structural phase now behind us, our teams are fully focused on delivering refined, high-quality interior finishes that will bring this iconic development to life.
Adwa Ewket reflects Temer Properties’ continued commitment to excellence in construction, strategic urban development, and contributing to the transformation of Addis Ababa’s commercial real estate landscape.
Construction
Milestones
Witness the transformation of our vision into reality. Every phase undergoes rigorous quality checks to ensure superior results matching international standards.
Quality Assurance
Rigorous inspection at every level.
Foundation Phase
Excavation, piling, and basement structure finished.
Structural Rise
Concrete works ongoing.
Finishing Works
Interior layouts, facade glazing, and MEP installations.
Project Gallery
Full Project Gallery